Davis Gap Transmission Project
Transmission Line
Miles:
2.5
Website:
https://www.tva.com/Energy/Tra...
Percent Operating:
100.0% (2.5 of 2.5 mi.)
Segments Operating:
1 of 1
Description:
TVA is proposing to build about 2.5 miles of single-circuit transmission line to power a new Fort Payne Improvement Authority substation on the south end of Fort Payne. The line would begin at TVA’s existing Fort Payne-Collinsville 161-kV Transmission Line and extend east to the new Davis Gap Substation to be located on the northeast corner of the intersection of Lebanon Road and U.S. Highway 11.
Contacts:
Title
Company
E-mail
Phone
Senior Vice President Transmission & Power Supply
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Transmission Siting Engineer
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Vice President, Transmission Construction & Maintenance
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Senior Transmission Engineer
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Project Manager
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Senior Transmission Line Design Engineer
Tennessee Valley Authority (TVA)
•••••••••••••
•••••••••••••
Analyst Notes:
Project Documents:
Davis Gap Transmission Project Map
Davis Gap Selected Transmission Route
Key Dates:
Companies Involved:
Company Name
Company Role
Tennessee Valley Authority (TVA)
•••••••••••••
Tennessee Valley Authority (TVA)
•••••••••••••
Segments:
Name
Voltage
Miles
Status
Davis Gap - Payne-Collinsville Tap
161 kV
2.4 mi
Operating
Line Location:
Above Ground
Development Timeline:
Time of Change
Year of Change
Status
Confirmed
Fall
2021
Under Construction
Winter
2022
Operating
Locations:
County
State/Province
Country
De Kalb
AL
USA
Stations:
Type
Voltage
Status
Payne-Collinsville Tap
Tap Line
Operating
Davis Gap
Substation
161 kV
Operating