Already a Subscriber?
Login
Ogden St. Networking Project
Transmission Line
Miles:
5.0
Website:
https://www.atc-projects.com/p...
Project Cost (M US$):
$•••••••••••••
Percent Operating:
100.0% (5.0 of 5.0 mi.)
Segments Operating:
3 of 3
Description:
The project includes the following:
Remove the foundations, transmission poles and wires east of the Interstate Bridge,
Install new foundations, transmission poles and a 69,000-volt transmission line across the Menominee River, west of the Ogden St. Bridge,
Make enhancements to the existing transmission poles and wires on the north and south sides of the Menominee River, and
Upgrade the components within the Ogden Street Substation in order to accommodate the overall changes in electrical infrastructure for this project.
Contacts:
Title
Company
E-mail
Phone
Transmission Vegetation Management Specialist
American Transmission Company
•••••••••••••
•••••••••••••
Senior Project Manager
American Transmission Company
•••••••••••••
•••••••••••••
Manager, Economic Planning - Strategic Projects/transmission Planning
American Transmission Company
•••••••••••••
•••••••••••••
Senior Transmission Planning Engineer
American Transmission Company
•••••••••••••
•••••••••••••
Senior Transmission Reliability Administrator
American Transmission Company
•••••••••••••
•••••••••••••
Analyst Notes:
Project Documents:
Ogden St. Networking Project
Key Dates:
Companies Involved:
Company Name
Company Role
American Transmission Company
•••••••••••••
American Transmission Company
•••••••••••••
Wisconsin Public Service
•••••••••••••
Segments:
Name
Voltage
Miles
Status
Wells Street-Ogden
69 kV
1.3 mi
Operating
Line Location:
Above Ground
Development Timeline:
Time of Change
Year of Change
Status
Confirmed
Second Half
2019
Under Construction
Second Half
2020
Operating
Locations:
County
State/Province
Country
Marinette
WI
USA
Stations:
Type
Voltage
Status
Ogden St (Marinette)
Substation
69 kV
Operating
Wells St (Marinette)
Substation
69 kV
Operating
Ogden-2nd Street
69 kV
2.0 mi
Operating
Line Location:
Above Ground
Development Timeline:
Time of Change
Year of Change
Status
Confirmed
Second Half
2019
Under Construction
Second Half
2020
Operating
Locations:
County
State/Province
Country
Marinette
WI
USA
Menominee
WI
USA
Stations:
Type
Voltage
Status
Ogden St (Marinette)
Substation
69 kV
Operating
2nd Street
Substation
69 kV
Operating
2nd Street-Fourth Avenue
69 kV
2.0 mi
Operating
Line Location:
Above Ground
Development Timeline:
Time of Change
Year of Change
Status
Confirmed
Second Half
2019
Under Construction
Second Half
2020
Operating
Locations:
County
State/Province
Country
Menominee
MI
USA
Marinette
WI
USA
Stations:
Type
Voltage
Status
Fourth Avenue
Substation
69 kV
Operating
2nd Street
Substation
69 kV
Operating